IoT Lighting in Practice

City One Shatin
IoT lighting for stairways and refuse rooms in Blocks 1–13, with brightness settings adapted to everyday use.

Auto Plaza
IoT tube retrofit for the ground-to-12th-floor car park and rear stairways, including modifications to existing tube fittings.

The International Commerce Centre
Sesdom IoT tubes for the B2–B4 car park, as recorded in the project reference. Monitoring results depend on the measured area and operating baseline.

Pau Fung Building
Lighting for shared circulation areas, using IoT tubes in stairways and ceiling lights in corridors.

Po Yan Building
IoT lighting across stairways and corridors, combining tube and ceiling-light fittings for shared areas.

Charmhill Centre
IoT tubes for circulation and building-service areas, with sensing and continuous lighting selected for different locations.

Yuen Long Commercial Centre
IoT tubes and downlights for building corridors and rear stairways, recorded as an installation in the September 2025 project reference.

Capricorn Centre
Two-foot and four-foot Sesdom IoT tubes for corridors and rear stairways, selected to suit the existing fittings.

Regent Heights
IoT tubes across corridors, refuse rooms, lift machine rooms, water-meter rooms and rear stairways.

Lei King Wan
Two-foot IoT tubes for rear stairways. The project reference records installation in January 2025.
Photo: Sesdom site survey, June 2024.
Further project references
Hong Kong · September 2025 reference
重慶大廈 · Chungking Mansions
Retrofit with two-foot and four-foot IoT tubes.
光明臺
Ceiling lights and IoT tubes for the estate and car park.
金碧花園
IoT tubes for the car park and rear stairways.
殷樺花園第一期
IoT tubes and downlights for podium lift lobbies, corridors, the car park and rear stairways.
守時商業大廈
IoT tubes for rear stairways and corridors.
溢財中心
IoT tubes for rear stairways and the car park.
順豐工業中心
Four-foot IoT tubes for the car park.
環滙廣場
Two-foot and four-foot IoT tubes for corridors and rear stairways.
Pipeline · September 2025 status
恆順園
Listed as in progress: IoT tubes for podium lift lobbies, corridors, the car park and rear stairways.
Hong Kong Science Park Phase 3 car park
Proposed scope of 635 tubes. The available proposal does not confirm completion.
嘉熙
Listed as awaiting installation: IoT tubes for rear stairways.
Mainland China references
藍月灣畔
IoT tube replacement for the garage in Shenzhen.
映月灣
IoT tubes for an underground car park in Shenzhen.
上海又又中心
IoT tube lighting for a shopping mall in Shanghai.
深圳吉祥龍花園 · 深圳前海東岸
Sesdom IoT tube replacement.



